Skip to content
Go Wright Logo
  • About
  • Services
    • Specialist Stone Conservation
    • Civil Engineering & Infrastructure
    • Principal Contracting
    • Social Housing Planned Maintenance
  • Projects
  • Careers & Social Impact
  • Contact us
  • About
  • Services
    • Specialist Stone Conservation
    • Civil Engineering & Infrastructure
    • Principal Contracting
    • Social Housing Planned Maintenance
  • Projects
  • Careers & Social Impact
  • Contact us

Christie Clock, Stirling

Client
Client:

Stirling Council

The Story

Heritage masonry within high-visibility public spaces is often as much about restoring community trust as it is about restoring stone. Following the complex structural events surrounding the Christie Clock’s removal in 2023, Go-Wright was appointed as the Main Contractor by Stirling Council to lead the specialist restoration and reconstruction of this 117-year-old landmark. At Go-Wright, we believe heritage masonry is as much about the people who walk past these landmarks every day as it is about the craftsmanship itself. Understanding the deep emotional and historical connection the local community has with the Allan Park memorial, we have undertaken a highly transparent, sympathetic, and collaborative approach to reviving this symbol of civic pride and bringing Stirling’s history home.

Our Technical Approach

This high-profile project demands a meticulous reconstruction of surviving original fabric, combined with precision engineering and elite multi-disciplinary coordination. As Main Contractor, our scope includes: 

  • Collaborative Heritage Leadership: Coordinating an elite team of conservation specialists to guarantee the highest standard of historic accuracy, including ZM Architecture for structural and heritage design, Graciela Ainsworth Sculpture Conservation to protect the artistic integrity of the monument, and H.E. Weir & Son to manage the intricate mechanics of the historic clock and steeple. 
  • Meticulous Structural Rebuild: Systematically cataloguing, preparing, and rebuilding the surviving original stonework, ensuring structural stability while preserving the authentic aged character of the masonry. 
  • Precision Stone Matching: Sourcing and hand-dressing new sandstone pieces to seamlessly supplement and integrate with the historic fabric where original elements were lost or damaged. 
  • Civils & Infrastructure Integration: Managing a safe, secure, and logistically sound site within a bustling public park environment, bridging the gap between delicate conservation artistry and robust civil engineering infrastructure. 

The Result

Entrusted with the ultimate responsibility of seeing this piece of Stirling’s history standing tall once again, Go-Wright is successfully driving the project toward its completion. By blending meticulous craftsmanship with a commitment to public transparency and community connection, we are restoring a beloved architectural icon to its original prominence, ensuring the Christie Clock remains a durable, proud focal point for the Stirling community well into the future 

5699671_ea2d544a_1024x1024
20260402_123300000_iOS
20260402_123301000_iOS 1
20260402_123301000_iOS 2

Ready to discuss your New project?

We’re ready to help. Contact us today to arrange a technical consultation, request a comprehensive quotation, or discuss the specific requirements of your electrical project.

Get in Touch
Certifications & Accreditations
constructionline
acclaim
federation-of-stone
helifix-approved-installer
thermatech
living-wage

Trusted construction and conservation contractor specialising in technically challenging projects across Scotland’s built environment. From specialist stone restoration and essential civil infrastructure to integrated multi-trade developments and social housing renewals.

All Rights Reserved @ 2026 GWL Electrical

Services
icon-w

Specialist Stone Conservation

icon-w

Civil Engineering & Infrastructure

icon-w

Principal Contracting

icon-w

Social Housing & Renewals  

Get in touch
  • 0141 375 7690
  • office@go-wright.co.uk
  • Unit 7, Dunrobin Court, Clydebank G81 2QP
Linkedin Instagram
© 2026 GO-Wright Ltd. All Rights Reserved. Cookie Policy | Privacy Policy | Company number SC384158
Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}